Cart: 0 items worth $0.00

Lubricant, front end pack, 16 x 0.95L bags in 19L bucket, suits conduit <75mm, Polywater

Lubricant, front end pack, 16 x 0.95L bags in 19L bucket, suits conduit <75mm, Polywater


Code: J-99
Brand: Polywater
Product Details
Lubricant, front end pack, 16 x 0.95L bags in 19L bucket, suits conduit <75mm, Polywater


The Polywater Front End Pack (FEP) is a plastic, lubricant filled bag. It is designed to lubricate ahead of the cable during the pull, minimising friction where it is needed most.

The Front End Pack lubricates far into the conduit where normal lubrication methods will not reach. This reduces the number of inspection/lubrication points needed during the pull. The lubricants reach into the bends of heavy HV cable pulls ensures that cable and sidewall tensions are minimised where needed most.

Polywater Lubricant J is a high performance, clean, slow-drying, water-based gel lubricant. Lubricant J provides maximum tension reduction in all types of cable pulling. It is especially recommended for long pulls, multiple-bend pulls and pulls in a hot environment. Lubricant J dries to form a thin lubricating film which retains its lubricity for months after use.

The Front End Packs are filled with Polywater J Lubricant which is a high performance, clean, slow-drying, waterbased gel lubricant. Polywater J Lubricant provides maximum tension reduction in all types of cable pulling. It is especially recommended for long pulls, multiplebend pulls and pulls in a hot environment.

Lubricant J dries to form a thin lubricating film which retains its lubricity for months after use.

Installation of Front End Packs is very simple

  1. Tie the Front end pack by zip ties or tape to the pulling rope ahead of the cable
  2. Start the pull and slit open the entire length of the bag as it enters the conduit
  3. The opened bag will disperse lubricant as the bag is squeezed through the bends

Polywater Lubricant J is a specification-grade lubricant that does not promote flame propagation when used with fire-retardant cables and systems. It is harmless to humans, environmentally safe, compatible with common Australian cable jacket materials, and can be easily applied as part of the unique Polywater® Lubricant Application System.

  • High performance cable lubricant for heavy cable installations 
  • Maximum Friction Reduction 
  • High Cling Factor
  • Compatible with common Australian cables
  • Temperature Stable 
  • Non-Combustible Residue 
  • Specification Grade “J”- The lubricant contain no waxes, greases, silicones, or polyalkylene glycol oils
  • Application System available in ‘Front End Packs’
  • Complete cleanup is possible with water
  • Pull-Planner software program for cable pulling tension calculation and conduit system design
Part #DescriptionExtra Details
J-DRUM208L Drum-
J-64018.9L Drum-
J-1283.8L Bucket-
J-1101.9L Front End Pack76mm diameter x 36mm long - suitable for conduit larger than 75mm
J-990.95L Front End Pack44mm diameter x 60mm long - suitable for conduit up to 75mm

(Front End Pack™is a conduit-sized polyethylene bag of lubricant. The Front End Pack™travels through the conduit on the winch line prelubricating the conduit ahead of the cable being pulled.)

Ask us about a demonstration of the American Polywater Pull-Planning Software that calculates pull tension volume of your lubricant required and ensures you maximise your productivity and profitability.

Read our technical article on 'Coefficient of Friction' - EstimatingTension when pulling cable into conduit

Companion Products

  • Mandrel, duct proving, HDPE, 90mm OD, suit 100mm electrical conduit, 180mmL, SPP
  • Cleaner, conduit, rubber, 125mm, SPP
  • Spreader, lube, rubber suit 100mm ID conduit, SPP
  • Wire brush, suit 100mm conduit 110mm OD, crimp gal wire twist M12 Eyenut welded, SPP

Back to the top

loader