Cart: 0 items worth $0.00

Lubricant, cable, poly "J", 3.8L bucket, Polywater

Lubricant, cable, poly "J", 3.8L bucket, Polywater


Code: J-128
Brand: Polywater
Product Details
Lubricant, cable, poly "J", 3.8L bucket, Polywater


Polywater Lubricant J is a high performance, clean, slow-drying, water-based gel lubricant. Lubricant J provides maximum tension reduction in all types of cable pulling. It is especially recommended for long pulls, multiple-bend pulls and pulls in a hot environment. Lubricant J dries to form a thin lubricating film which retains its lubricity for months after use.

Polywater Lubricant J is a specification-grade lubricant that does not promote flame propagation when used with fire-retardant cables and systems. It is harmless to humans, environmentally safe, compatible with common Australian cable jacket materials, and can be easily applied as part of the unique Polywater® Lubricant Application System.

  • High performance cable lubricant for heavy cable installations 
  • Maximum Friction Reduction 
  • High Cling Factor
  • Compatible with common Australian cables
  • Temperature Stable 
  • Non-Combustible Residue 
  • Specification Grade “J”- The lubricant contain no waxes, greases, silicones, or polyalkylene glycol oils
  • Application System available in ‘Front End Packs’
  • Complete cleanup is possible with water
  • Pull-Planner software program for cable pulling tension calculation and conduit system design
Part # Description Extra Details
J-DRUM 208L Drum -
J-640 18.9L Drum -
J-128 3.8L Bucket -
J-110 1.9L Front End Pack 76mm diameter x 36mm long - suitable for conduit larger than 75mm
J-99 0.95L Front End Pack 44mm diameter x 60mm long - suitable for conduit up to 75mm

(Front End Pack™is a conduit-sized polyethylene bag of lubricant. The Front End Pack™travels through the conduit on the winch line prelubricating the conduit ahead of the cable being pulled.)

Ask us about a demonstration of the American Polywater Pull-Planning Software that calculates pull tension volume of your lubricant required and ensures you maximise your productivity and profitability.

Read our technical article on 'Coefficient of Friction' - EstimatingTension when pulling cable into conduit

Companion Products

  • Lubricant, front end pack, 16 x 0.95L bags in 19L bucket, suits conduit <75mm, Polywater
  • Pump, drill operated for Polywater lubricant, c/w 3m hose, suit 19L bucket
  • Cleaner, conduit, rubber, 125mm, SPP
  • Spreader, lube, rubber suit 100mm ID conduit, SPP

Back to the top

loader